What minimum daily payment do shed hands receive?
Live source verification unavailable until status loads
Quick explanation
Previously reviewed explanation — check official wording before use
Shed hands, Woolpressers and Woolpresser-shed hands are paid by the run with at least 2 runs for an attendance day. On cut out, work beyond the normal lunch break attracts 4 runs.
Check the conditions
- If sheep are voted wet at the third/fourth run, pay completed runs plus the run about to start or partly completed.
Exceptions
- No daily minimum applies where attendance is not required for wet weather and the employee is told each preceding day, or given the starting time more than 24 hours ahead.
Read the official wording and citations
Pastoral Award 2020 — FWC Award text hosted by the Fair Work Ombudsman
FWC · MA000035 · Clause 50
50. Classifications
[Varied by PR724570, PR729479, PR740884, PR762308, PR774088]
[50.1 substituted by PR734194 from 27Sep21]
50.1 The minimum rates of pay provided for in clauses 51.1 to 51.6 will apply to casual employees engaged for work in a shed, other than Woolclassers and Shearing shed experts, in one or more of the following categories:
Shearer;
Crutcher;
Shed hand;
Woolpresser; or
Shearing cook.
A composite of these categories may apply where the employee has mixed functions, except Shearers.
50.2 Shed hands or Woolpresser-shed hands
(a) A shed hand or Woolpresser-shed hand may be required to work as a generally useful hand in or about the shearing shed either during the crutching or shearing or when crutching or shearing is not taking place.
(b) Shed hands, Woolpressers and Woolpresser-shed hands will be paid by the run (as defined in clause 54.1(b)).
(c) Minimum daily payment
(i) Employees will be guaranteed a minimum daily payment for 2 runs on any day on which the employee attends for duty; except
if on the day of cut out work continues beyond the normal lunch break then payment will be made for 4 runs; or
if sheep are voted wet at the commencement of the third or fourth run, then they will be paid for all completed runs on that day together with the run due to commence or partly completed at the time sheep are voted wet.
(ii) Minimum payment per day will not apply where an employee is not required to attend for work because of wet weather, provided that:
the employee is advised on each preceding day that they will not be required to attend; or
the employee is advised by the employer of a starting time with more than 24 hours’ notice.
(d) When an employee has mixed functions (e.g. as Woolpresser and shed hand) they will be paid at the rate that attracts the higher minimum rate of pay under this award.
(e) Woolpresser-shed hands and shed hands will weigh, brand, store and carry wool to the press without extra payment.
(f) An employer may direct a shed hand to carry out the duties of a Woolpresser, provided that:
(i) the employee will only be required to perform those duties of a Woolpresser that are within the limits of that employee’s skill, competence and training;
(ii) the performance of such duties does not involve either an alteration to the employee’s classification or a major and substantial change in the duties normally performed by the employee; and
(iii) the direction will be given only in the pursuit of the efficient conduct of a shearing or crutching operation in circumstances of unavailability of a contracted Woolpresser for a limited period.
50.3 Woolpressers
(a) A Woolpresser or Woolpresser-shed hand will:
(i) press as soon as possible all the wool shorn or crutched from the relevant shearing or crutching;
(ii) weigh, brand and store the wool; and
(iii) press and close the bales in the manner and, as nearly practicable, to the weight directed by the overseer, and remove all clippings and string from the inside of the bales and clear away such clippings and string and all loose wool from the portion of the shed occupied for woolpressing.
(b) An employer may direct a Woolpresser to carry out the duties of a shed hand, provided that:
(i) the employee will only be required to perform those duties of a shed hand that are within the limits of that employee’s skill, competence and training; and
(ii) the performance of such duties does not involve either an alteration in the employee’s classification or a major and substantial change in the duties normally performed by the employee.
50.4 Shearing cooks
(a) Shearing cooks will prepare and cook up to 5 meals per day, including morning and afternoon tea, for an agreed number of persons.
(b) The total number of persons for whom an employee is to cook, on the average of the shearing or crutching, will not be:
(i) less than the minimum number agreed upon; or
(ii) more than the maximum number agreed upon.
(c) If any of the employees for whom the Shearing cook is to cook for, strike or wilfully cease work against the direction of the employer, the Shearing cook will be entitled to payment of wages in respect only of those employees who do not strike or cease work.
(d) The Shearing cook will provide at the cook’s own expense such suitable assistant or assistants as may be necessary for the proper cooking and serving of food.
(e) Shearing cooks may be engaged per half day.
(f) On the day prior to the commencement of shearing or crutching, should the Shearing cook be required to prepare the evening meal or clean and prepare the kitchen for a normal start on the following day, payment will be made at 50% of the daily or piecework rate.
(g) On the day of cut out a Shearing cook will be guaranteed 50% of the daily or piecework rate. However should shearing proceed after the normal midday meal break, a full day’s wages will be payable.
(h) Where a Shearing cook is engaged to cook for non-resident employees and prepares morning and afternoon tea and a midday meal they will receive 50% of the daily or piecework rate.
(i) Where clause 50.4(h) applies, employees will be required to contribute a maximum of 50% of the rate established pursuant to clause 51.6 of this award.
50.5 Shearers and learner shearers
(a) Shearers
Shearers will be engaged to shear and/or crutch sheep.
(b) Learner shearers
(i) A learner will mean a shearer or intending shearer who has not yet shorn 5000 sheep.
(ii) A learner who starts in a shed as a learner may continue to be regarded as a learner under clause 50.5 for a run of sheds, although they become a shearer, not a learner, before the run of sheds is completed.
(iii) The learner must produce to their employer or intended employer a certificate, log book or equivalent in the following form showing the number of sheep they have shorn:
LEARNER’S CERTIFICATE TO BE PRESENTED AT EACH SHEARING
Issued to ……………………………..
Home address ………………………………
Date of issue of certificate ………………………………….
Age ……………………………………..
Date | Station | Total sheep shorn | Average tally per day (whole days) | Signature of owner or manager or shed overseer | Signature of learner | Total sheep shorn prior to issue of this certificate
| | | | | |
[50.5(b)(iv) varied by PR724570, PR729479, PR740884, PR762308, PR774088 ppc 01Jul24]
(iv) The earnings of a learner shearer will not be less than they would have received had they been employed for the same period as an adult shed hand, plus the combs and cutters allowance of $24.36 per week. The agreement of such specified learner will be endorsed “learner” at the time it is signed.
50.6 Crutchers
Crutchers will be engaged to crutch sheep, either a full crutch or other crutch.
50.7 Woolclassers
The classification and duties structure is as follows:
(a) Woolclasser level 1
Woolclasser level 1 (W1) may be required to undertake woolclassing duties only. These duties, which will be carried out in accordance with the directions and orders of the owner or nominated representative, will be as follows:
(i) to classify the wool and advise and report generally as a wool expert, according to the industry agreed code of practice as published by the Australian Wool Exchange Limited or its successors;
(ii) to instruct the woolrollers and supervise the skirting and rolling of the fleece;
(iii) to instruct and supervise the piece-pickers, the pickers-up as far as concerns their duty in picking up the fleeces and all other persons engaged in the handling of the wool;
(iv) to instruct the Woolpressers and exercise a general supervision over the pressing, weighing and branding of the bales;
(v) to keep the shed wool book, or see that it is kept by the Woolpresser or woolweigher, to the satisfaction of the employer, and, where required, to write up the station permanent wool and weight book daily (one copy only); and
(vi) to complete waybills if and when required.
(b) Woolclasser level 2
A Woolclasser level 2 (W2) may be required to undertake:
(i) woolclassing duties, being any of the duties outlined in relation to Woolclasser level 1; and
(ii) woolrolling, where such work is incidental to the duties of a Woolclasser, and other shed hand work where such work is a minor and incidental part of the duties of the Woolclasser. In the interest of efficient performance of work by the Woolclasser, such woolrolling will not be performed in a shed where more than 900 fleeces per day are shorn.
(c) Woolclasser level 3
A Woolclasser level 3 (W3) may be required to undertake:
(i) woolclassing duties, being any of the duties described for Woolclasser level 1 above;
(ii) woolrolling or other shed hands work as described for Woolclasser level 2 above;
(iii) overseeing or management of the board, provided that a Woolclasser must not do overseeing nor take the management of the board in addition to doing woolclassing in any shed where more than 12 Shearers are employed;
(iv) bookkeeping; and
(v) experting, as described in clause 50.8, provided that except in the case of an emergency, a Woolclasser must not act as an expert in addition to doing woolclassing in a shed where more than 6 Shearers are employed at any one time.
50.8 Shearing shed experts
(a) Shearing shed expert level 1
A Shearing shed expert level 1 (E1) may be required to perform experting duties only. The duties of a Shearing shed expert will include:
(i) attending to the shearing shed machinery;
(ii) engine driving;
(iii) the grinding of combs and cutters; and
(iv) such other duties as may be agreed upon by the employer and the employee at the time of the employee’s engagement.
(b) Shearing shed expert level 2
A Shearing shed expert level 2 (E2) may be required to perform:
(i) experting duties as described for Shearing shed expert level 1;
(ii) woolrolling or other shed hands work where such work is a minor and incidental part of the duties of an expert. In the interest of efficient performance of work, such woolrolling must not be performed in a shed where more than 900 fleeces per day are shorn;
(iii) overseeing or management of the board; and
(iv) bookkeeping.
Complete normalized source clause. Exact snapshot/raw integrity checked; explanation review status is recorded separately on each entry. Parent-clause citation does not establish exhaustive paragraph coverage.
© Commonwealth of Australia 2026. Fair Work Commission. Consolidated Award text hosted by the Fair Work Ombudsman. Quotations retain source wording; whitespace/table formatting is normalised for display. Personal/non-commercial or internal use only under the FWC copyright notice. Quick Award explanations are separate AI source-checked text; no government endorsement.
- Official document
- Pastoral Award 2020 — FWC Award text hosted by the Fair Work Ombudsman ↗
- Version
- This Fair Work Commission consolidated modern award incorporates all amendments up to and including 1 July 2026 (PR799280, PR799316 and PR799473). ↗
- Citation verified
- Operative note
- Based on the current consolidated Award text incorporating amendments up to and including 1 July 2026. That consolidation date is not the commencement date of every provision; check the relevant variation and operative conditions when assessing an earlier period.
Pastoral Award 2020 — FWC Award text hosted by the Fair Work Ombudsman
FWC · MA000035 · Clause 54
54. Hours of work for Shearers and Crutchers
54.1 Ordinary hours
(a) The ordinary hours of work for Shearers and Crutchers will be 38 per week, Monday to Friday.
(b) The hours will not exceed 8 per day and will be worked in 2 hour groupings called runs. The run times are Monday to Friday as follows:
(i) 7.30 am–9.30 am
(ii) 10.00 am–12.00 pm
(iii) 1.00 pm–3.00 pm
(iv) 3.30 pm–5.30 pm
54.2 Clause 54.1 will be read subject to the provisions of clause 54.3 and the following:
(a) if agreement between the employer and the majority of employees exists there may be an alteration of the starting time by a maximum of 2 hours’ to allow for work to be completed in extenuating circumstances;
(b) work will not commence prior to 5.30 am or later than 7.30 am except where sheep have not been presented for shearing or crutching due to inclement weather;
(c) runs will be of 2 hours duration and be worked continuously except for tea and lunch breaks;
(d) circumstances for which alteration to the starting time in accordance with clause 54.2 may be made are limited to:
assisting travel arrangements (e.g. day of cut out and travel home);
ensuring daylight requirements where shed lighting is not available;
stock welfare; and
when rising flood water creates exceptional circumstances; and
(e) the entitlements in clause 54.2 are non-cumulative.
54.3 Restrictions on working 8 hours
The restriction on working 8 hours will not apply:
(a) where the tail end of a mob of ewes with lambs or unweaned lambs are in the pens at 5.30 pm on Friday awaiting shearing (or crutching), the shearing (or crutching) may, at the option of the employer, be continued for not more than half an hour, but so far only as may be necessary for the purpose of shearing (or crutching) the said ewes and/or lambs;
(b) if not more than 3 sheep per Shearer/Crutcher are left in the pens at 5.30 pm on Friday they may, at the option of the employer, be shorn (or crutched) then for the purpose of cutting out a particular flock; or
(c) if on the day of the cut out, there remains in the pens after the last run of the day, the number of sheep as could be ordinarily shorn (or crutched) in 60 minutes, the shearing (or crutching), at the option of the employer, may be continued until the sheep are shorn (or crutched). If the option of the employer is taken and work time exceeds 30 minutes, all time workers will receive an additional 2 hours’ (one run) payment.
54.4 Special conditions regarding the hours of work of Shearers and Crutchers
(a) Where a Shearer or Crutcher has not completed 38 hours work during the preceding week, or 8 hours per day if the shearing commenced later in the week, by reason of the fact that sheep presented for shearing or crutching are voted wet or sheep are not presented for shearing or crutching because of rain or sweating, a Shearer or Crutcher may be required by the employer to work on the Saturday and/or Sunday immediately succeeding the week in which work could not be performed for these reasons only, provided that:
(i) any work performed on a Saturday or a Sunday pursuant to clause 54.4 must be performed in accordance with the run schedules in clause 54.1(b);
(ii) any work performed on a weekend pursuant to clause 54.4 must be performed from the commencement of the first available run after the condition of the sheep permit their shearing or crutching except that by agreement between the employer and the employee another or other mutually convenient run or runs available on that weekend may be substituted;
(iii) the work on Saturday and/or Sunday will only replace the time lost during the preceding week; and
(iv) reasonable notice of the need to work on the weekend will be given.
(b) A signal will be given 3 minutes (one minute in the case of crutching) before the end of each run and no Shearer (or Crutcher) will catch another sheep during that run after the signal has been given.
(c) The employee will finish the shearing (or crutching) of any sheep they are shearing (or crutching) at the end of each run.
(d) The employer and employee will record and retain at the appropriate place of employment a written record in the tally book when make-up time is worked, if sheep are determined wet during the normal course of shearing in the preceding Monday to Friday.
(e) The tally book will show those employees who worked make-up time, the date of the work and the number of runs worked during the weekend. The employer will retain this written record for a period of not less than 6 years.
Complete top-level clause extracted from the checked official consolidated text, including the available subordinate paragraphs and tables. Source wording and official numbering retained; whitespace/table layout normalised. AI source-checked for this user-authorised local release; no human professional review.
© Commonwealth of Australia 2026. Fair Work Commission. Consolidated Award text hosted by the Fair Work Ombudsman. Quotations retain source wording; whitespace/table formatting is normalised for display. Personal/non-commercial or internal use only under the FWC copyright notice. Quick Award explanations are separate AI source-checked text; no government endorsement.
- Official document
- Pastoral Award 2020 — FWC Award text hosted by the Fair Work Ombudsman ↗
- Version
- This Fair Work Commission consolidated modern award incorporates all amendments up to and including 1 July 2026 (PR799280, PR799316 and PR799473). ↗
- Citation verified
- Operative note
- Based on the current consolidated Award text incorporating amendments up to and including 1 July 2026. That consolidation date is not the commencement date of every provision; check the relevant variation and operative conditions when assessing an earlier period.