When can shearing continue beyond the 8-hour restriction?
Live source verification unavailable until status loads
Quick explanation
Previously reviewed explanation — check official wording before use
At the employer’s option, Friday 5:30 pm pens may be finished for up to 30 minutes for tail-end ewes with lambs/unweaned lambs, or for up to 3 remaining sheep per Shearer/Crutcher to cut out a flock.
Check the conditions
- On cut-out day, remaining penned sheep normally shearable in 60 minutes may be finished after the last run. If that work exceeds 30 minutes, all timeworkers receive an additional 2-hour run payment.
Read the official wording and citations
Pastoral Award 2020 — FWC Award text hosted by the Fair Work Ombudsman
FWC · MA000035 · Clause 54
54. Hours of work for Shearers and Crutchers
54.1 Ordinary hours
(a) The ordinary hours of work for Shearers and Crutchers will be 38 per week, Monday to Friday.
(b) The hours will not exceed 8 per day and will be worked in 2 hour groupings called runs. The run times are Monday to Friday as follows:
(i) 7.30 am–9.30 am
(ii) 10.00 am–12.00 pm
(iii) 1.00 pm–3.00 pm
(iv) 3.30 pm–5.30 pm
54.2 Clause 54.1 will be read subject to the provisions of clause 54.3 and the following:
(a) if agreement between the employer and the majority of employees exists there may be an alteration of the starting time by a maximum of 2 hours’ to allow for work to be completed in extenuating circumstances;
(b) work will not commence prior to 5.30 am or later than 7.30 am except where sheep have not been presented for shearing or crutching due to inclement weather;
(c) runs will be of 2 hours duration and be worked continuously except for tea and lunch breaks;
(d) circumstances for which alteration to the starting time in accordance with clause 54.2 may be made are limited to:
assisting travel arrangements (e.g. day of cut out and travel home);
ensuring daylight requirements where shed lighting is not available;
stock welfare; and
when rising flood water creates exceptional circumstances; and
(e) the entitlements in clause 54.2 are non-cumulative.
54.3 Restrictions on working 8 hours
The restriction on working 8 hours will not apply:
(a) where the tail end of a mob of ewes with lambs or unweaned lambs are in the pens at 5.30 pm on Friday awaiting shearing (or crutching), the shearing (or crutching) may, at the option of the employer, be continued for not more than half an hour, but so far only as may be necessary for the purpose of shearing (or crutching) the said ewes and/or lambs;
(b) if not more than 3 sheep per Shearer/Crutcher are left in the pens at 5.30 pm on Friday they may, at the option of the employer, be shorn (or crutched) then for the purpose of cutting out a particular flock; or
(c) if on the day of the cut out, there remains in the pens after the last run of the day, the number of sheep as could be ordinarily shorn (or crutched) in 60 minutes, the shearing (or crutching), at the option of the employer, may be continued until the sheep are shorn (or crutched). If the option of the employer is taken and work time exceeds 30 minutes, all time workers will receive an additional 2 hours’ (one run) payment.
54.4 Special conditions regarding the hours of work of Shearers and Crutchers
(a) Where a Shearer or Crutcher has not completed 38 hours work during the preceding week, or 8 hours per day if the shearing commenced later in the week, by reason of the fact that sheep presented for shearing or crutching are voted wet or sheep are not presented for shearing or crutching because of rain or sweating, a Shearer or Crutcher may be required by the employer to work on the Saturday and/or Sunday immediately succeeding the week in which work could not be performed for these reasons only, provided that:
(i) any work performed on a Saturday or a Sunday pursuant to clause 54.4 must be performed in accordance with the run schedules in clause 54.1(b);
(ii) any work performed on a weekend pursuant to clause 54.4 must be performed from the commencement of the first available run after the condition of the sheep permit their shearing or crutching except that by agreement between the employer and the employee another or other mutually convenient run or runs available on that weekend may be substituted;
(iii) the work on Saturday and/or Sunday will only replace the time lost during the preceding week; and
(iv) reasonable notice of the need to work on the weekend will be given.
(b) A signal will be given 3 minutes (one minute in the case of crutching) before the end of each run and no Shearer (or Crutcher) will catch another sheep during that run after the signal has been given.
(c) The employee will finish the shearing (or crutching) of any sheep they are shearing (or crutching) at the end of each run.
(d) The employer and employee will record and retain at the appropriate place of employment a written record in the tally book when make-up time is worked, if sheep are determined wet during the normal course of shearing in the preceding Monday to Friday.
(e) The tally book will show those employees who worked make-up time, the date of the work and the number of runs worked during the weekend. The employer will retain this written record for a period of not less than 6 years.
Complete top-level clause extracted from the checked official consolidated text, including the available subordinate paragraphs and tables. Source wording and official numbering retained; whitespace/table layout normalised. AI source-checked for this user-authorised local release; no human professional review.
© Commonwealth of Australia 2026. Fair Work Commission. Consolidated Award text hosted by the Fair Work Ombudsman. Quotations retain source wording; whitespace/table formatting is normalised for display. Personal/non-commercial or internal use only under the FWC copyright notice. Quick Award explanations are separate AI source-checked text; no government endorsement.
- Official document
- Pastoral Award 2020 — FWC Award text hosted by the Fair Work Ombudsman ↗
- Version
- This Fair Work Commission consolidated modern award incorporates all amendments up to and including 1 July 2026 (PR799280, PR799316 and PR799473). ↗
- Citation verified
- Operative note
- Based on the current consolidated Award text incorporating amendments up to and including 1 July 2026. That consolidation date is not the commencement date of every provision; check the relevant variation and operative conditions when assessing an earlier period.